soda-lime glass all electrical melting furnace
发布人: 汪庆卫   发布时间: 2016-03-02    浏览次数:

soda-lime glass all electrical melting furnace


the advantage

(1). Improve the stability and uniformity of whole glass to better the quality of glass, especially in Lead glass.

(2). Higher heating efficiency in melting process, less power consumption, longer campaign. Better control of volatilization and corroding of Lead.

(3). It is quick and convenience to adjust the temperature of melting and shaping, with higher sensitive and better precision.

(4). lower investmentless area occupiedsimpler operationwithout noises and pollutionbetter work environmenthigher labor-productivity.

(5). it accords with the industrial policy of developing country, and adapts to the transformation and adjust of energy structure in and out of country. We can gain more opportunities in market competition and technology improvement.


brief introduction

This quotation includes the design and equipment of a sodalime silicate glass electric melting furnace which can produce three ton semi-manufactured goods per day. In the design of this melter, we decide to use tin oxide electrode, melter section include fore-furnace’s driving equipment such as fore-furnace transformercontrol tankstirrer, all refractory brick where melting and feedingsteel structurewater circulation system and accessorial system, which made the whole design from preparation of batch to outflow of glass.

As to control system, we use special-type separate transformer, which accord with security standard of our country and electric melting furnace. All the furnace liner bricks is electric melting AZS bricks, AZS bricks containing 41% zirconia is used where is key position. Parapet and tip of melter build by sillimanite bricks or AZS bricks. Outer is made of high-aluminium bricks and heat preservation bricks. There are at least two separate heating area due to several electrodes in melting section and clarifying section, and there are a few heating section in flowing holeraising passage and channel flume. shaping section using Platinum have two outflows for machine shaping , every unit have separate control system.

Whole heating system have automatic and manual device, have gather-scatter control, can inspect by internet(fee would count in addition). Whole fore-furnace control system is consisted of driving command, parameter show, and simulate alarm system, furthermore, control section include some accessorial equipments.